Skip to content

CKS TB_38 - 38.1mm (1.5") Rugged Industrial Black Universal/Reduced Trackerball

by CKS
SKU CKS-TB_38U_BK_65_Q
Sold outPlease request a quote using the form down below.

Ruggedised trackerballs are one of the most reliable computer peripheral devices. In fact, many computing devices used for precise system monitoring operations have an integrated industrial-grade trackball.

The CKS TB38 – 38.1 mm (1.5”) rugged industrial trackerball has the features ideal for the steel manufacturing, military, and distribution industries.  It is made with a phenolic resin material which resists wear and liquid chemicals. As a result, it can withstand prolonged use in many industrial processes.

With an extended 3 year warranty as standard, the CKS TB38_38 can handle long-lasting and consistent controls.

Ideal for all industrial, rugged applications, Keyboard Specialists Ltd (KBS) would recommend the CKS range for all controls. Contact a member of the KBS team on 0203 474 0234 for more information.

Request a quote

Technical Specification

  • Approvals: FC, CE, IP, NEMA, ROHS,
  • Ball Diameter (nominal): 38.1mm (1.5")
  • Cable Length: 2 m
  • Connections: USB / PS2 / AT / RS232 / RS422 / RS485 / XT / TTL / DEC / SUN
  • Datasheet: CKS-TB_38.pdf
  • Dimensions: Refer to images for Universal and Reduced Dimensions.
  • Integrated Peripherals: Trackball
  • IP Rating : IP 65
  • Material: Phenolic Resin Ball
  • Mounting: Can be supplied with interface cabled and buttons for mounting into customers equipment
  • Special Features: Fully customisable TB_38 Series Tracksball
  • Tracking Force: 20 g
  • Warranty: 3 Year RTB Warranty - Extendable up to 5 Years
  • Weight: 80 g
  • Download Datasheet
In Stock
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 Days
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 2 - 4 weeks
Lead time: 4 - 6 Weeks
Lead time: 4 - 6 Weeks
Lead time: 4 - 6 Weeks
Lead time: 4 - 6 Weeks
Lead time: 5 - 7 Days
Lead time: 5 - 7 Days
Lead time: 5 - 7 Days
Lead time: 5 - 7 Days
Lead time: 5 - 7 Days